Piemonte House, House rebuild or renovate in Piemonte

Italiano
Rebuild or renovate your dreamplace in Piemonte

Indicative costs for renovation of a building or new Re-construction

The costs for a renovation depend on many factors, the size of the building, the condition of the structural parts, the place where the building is located, careful initial planning and other factors such as material costs.

1. Renovate

the average price* per square meter can be considered around €1,500.00/1,800.00 + 10% VAT.
The duration of the renovation depends on the size of the property and other factors, usually a period of 1 to 1.5 years

2. New Construction

average price* per square meter from €1,500.00 to €2,000.00 + 10% VAT.
Duration of the works depending on the size of the building and other factors, approximately 1.5/2 years;

The costs indicated include:

  • Structural consolidations
  • Heating system
  • Plumbing work
  • Electrical connections and cables
  • Windows and doors
  • Bathrooms
  • Kitchen
  • Floors

* IMPORTANT: ALL THE PRICES ARE ONLY INDICATIVE AND HAVE NO VALUE FOR THE REAL QUOTATION

More in detail

and factors to keep in mind

Notary

Calculated as a percentage of the property purchase price.

Commissions

Real estate agent’s fee: carefully check that it is not duplicated or excessive.

Architectural Designer and work supervision

Between 8–12% of the total cost of the renovation project.

Safety plan

Mandatory for workers’ safety; depends on costs, workload, and risk level.

Geological report

Mandatory to verify if the building is in a safe geological area, or required for building a swimming pool or changing the intended use of part of the property.

Structures

Structural design by an engineer for reinforced concrete parts and other structural elements.

Private road

Always check if the existing road requires maintenance. Building an access driveway to the property (upon estimate).

Authorizations

The cost of building permits and authorizations from the Municipality depends on many factors: municipal fees and taxes, building volume, project cost, possible Landscape Commission approval, and changes of use of the premises.

Water supply

Is the building already connected to the water supply? Otherwise request an estimate, also depending on the distance from the main pipeline.

Electricity/Enel

Does the building require connection to the public electricity grid if not already present? Otherwise request an estimate, also depending on the distance from the main line and the available capacity.

Sewerage/Septic tank

If the building is not connected to the public sewer system: installation of a treatment system for grey and black water, with grease trap + Imhoff tank and dispersion into the ground via sub-irrigation, to be sized according to the number of bathrooms and potential occupants.

Gas/LPG

The tank is usually provided on a loan-for-use basis by the gas supplier.

Swimming pool

The cost depends on the size of the pool and the materials used (concrete, finishes, systems).

Retaining wall

Check whether there is a need to build or reinforce retaining walls for the land.

Translation

Any translations of documents if requested;

urban planning practices

Everything you will need

  • Architectural design/Executive design;
    Requests for site inspections and contracts for connection and supply of water and electricity for construction sites and/or permanent use;
  • Lex 10/91 energy containment report (if required by the intervention);
  • Geological Report (if required by the intervention);
  • Analysis of excavated earth and rocks (if required by the intervention);
  • Acoustic-Passive Requirements Report;
  • Roof lifeline project (if required by the intervention);
  • Structural report and final structural testing (if required by the intervention);
  • Design of thermal and electrical/photovoltaic system (if required by the intervention);
  • Calculation and metric calculation of the works;
  • Specifications and Contracts;
  • Site Security Coordinator;
  • Work management and assistance;

Beginning of work
Possible variation during construction accompanied by all the documents mentioned above if necessary;
End of work;

  • APE: Energy performance certificate;
  • Definitive Land Registry and Completion Report;
  • Request for usability and completion of the works;

To be decided

Once the projects are completed,
even before obtaining the permissions

  • Construction companies:
    Construction work…
    Internal and external finishes...
    Tiles or type of floors…
    Interior/exterior wall colors...
    Pool salt or chlorine and color...
  • Plumbing:
    Heating system (underfloor or radiators)
    whether cooling, heat pump or boiler…
    Line and models of bathroom accessories…
  • Electrician:
    TV – internet – distribution – electrical boxes
    Alarm system, cameras...
  • Carpenter:
    New windows in wood or aluminum with a wood effect or lacquered;
    External shutters;
    Internal doors;
  • Blacksmith: ...

Our offer

The first simple step to your dream home

We know that the amount of things to decide and the amount of bureaucracy can be confusing, and prices can vary a lot based on the specifics of the individual project.

» Write to us and ask us for the convenient form to fill in without obligation for a first definition of your project.

You will have clearer ideas about what you want and we will give you the first directives to best guide you in creating the home of your dreams!